Location:
Fall River, MA
Owner:
MassDOT
Contract Value:
$30,000,000
Project consisted of rehabilitation of 4,000′ long truss bridge over the Taunton River. Work included 400 CY of concrete beam/strut strengthening as well as steel floor beam, stringer, and lateral brace strengthening repairs. Other work included: 175 EA jacking shoring for bridge bearing replacement, 4,680 LF of bridge joint replacement, extensive maintenance and protection of traffic on I-195 (including setting 91,000 LF temporary median barrier), 4,050 CF structural concrete repairs, and 667 CY concrete deck overlay.
1/2013- 12/2016
Completed 4 months Early / On Budget