top of page

MAIN ROAD BRIDGE REPLACEMENT

CLIENT:           RIDOT

LOCATION:    TIVERTON, RI

Project consisted of a phased construction 140-foot, two-span highway bridge. Work included cast-in-place substructure, phased earth support, precast beam installation, approach work, cast-in-place retaining walls, drainage and utility work, rock removal, paving, and cast-in-place concrete deck.

bottom of page