DESIGN BUILD – ROUTE 79 INTERCHANGE/BRAGA BRIDGE

Project Overview

Project consisted of rehabilitation of 4,000′ long truss bridge over the Taunton River. Work included 400 CY of concrete beam/strut strengthening as well as steel floor beam, stringer, and lateral brace strengthening repairs. Other work included: 175 EA jacking shoring for bridge bearing replacement, 4,680 LF of bridge joint replacement, extensive maintenance and protection of traffic on I-195 (including setting 91,000 LF temporary median barrier), 4,050 CF structural concrete repairs, and 667 CY concrete deck overlay.

1/2013- 12/2016

Completed 4 months Early / On Budget

Project Overview

ChatGPT Image Jun 12, 2026, 06_34_07 PM.png

Client:
MassDOT

9f2f09b4-d13b-47ff-bc00-5011dd2430ba.png

Location:
FALL RIVER, MA