top of page

FRENCHTOWN BROOK BRIDGE
Project Overview
Accelerated Bridge Construction (ABC) project where entire 150′ long bridge was removed and replaced with a prefabricated precast concrete culvert bridge in 33 days.Project included extensive earth work, demolition, control of water, earth support cast-in-place concrete, precast concrete, utility, paving, and vehicle traffic control.
Project Overview

Client:
RIDOT

Location:
NORTH KINGSTOWN, RI
bottom of page



