FRENCHTOWN BROOK BRIDGE

Project Overview

Accelerated Bridge Construction (ABC) project where entire 150′ long bridge was removed and replaced with a prefabricated precast concrete culvert bridge in 33 days.Project included extensive earth work, demolition, control of water, earth support cast-in-place concrete, precast concrete, utility, paving, and vehicle traffic control.

Project Overview

ChatGPT Image Jun 12, 2026, 06_34_07 PM.png

Client:
RIDOT

9f2f09b4-d13b-47ff-bc00-5011dd2430ba.png

Location:
NORTH KINGSTOWN, RI