MAIN ROAD BRIDGE REPLACEMENT

Project Overview

Project consisted of a phased construction 140-foot, two-span highway bridge. Work included cast-in-place substructure, phased earth support, precast beam installation, approach work, cast-in-place retaining walls, drainage and utility work, rock removal, paving, and cast-in-place concrete deck.

Project Overview

ChatGPT Image Jun 12, 2026, 06_34_07 PM.png

Client:
RIDOT

9f2f09b4-d13b-47ff-bc00-5011dd2430ba.png

Location:
PROVIDENCE, RI